JUST RELEASED! EARTHQUAKE RESISTANT BUILDING from reinforced concrete - Volume C'BUY NOW
Contractor: VASILIS SOMARAKIS, an expert in using the detailing module HoloBIM and the 'THORAΧ' stirrup type.
finishing and preparations for concrete layer
column mounting with Antiseismic Thorax system (unified for basement to foundation)
of foundation floor
for the creation of the foundation floor
of columns and foundations beams
and footing shoe bar distribution
completion and wire mesh implementation on foundation beam shoes.
of foundation beam body and implementation of the rest of the columns
and formwork creation
of foundation beams shoes
ready for backfilling
reinforced with a light wire mesh and concreting beginning
with the removal of concrete leftovers and addition of elastomers
and molding of internal columns
and insulation protection
for backfilling
τοποθέτηση πάτων δοκών
for molding
and implementation of electrical pipes
Columns, and molding of ground floor beams
or molding